It
is always advisable to out the PE pipeline testing before
the covering. Generally the testing are carried out
sectioning parts of proper length, Which must be closed
with suitable systems.
For example, with blank
flanges provided with connections for pressure gauge,pump,breathers,etc.
The pipeline must be
anchored avoiding the movement of under pressure pipelines,
and proceeding with partial trench covering leaving
the jointings uncovered for further inspection. The
pipeline is filled with water from the most low-laying
point where the manometer must be
installed. Particular car is applied for the out coming
of air from breathers,cocks,etc.
The pipeline is placed
under pressure at a value up to 1,5 times the nominal
pressure at 20C for 1 hour.
If there is a pressure loss, it is important to measure
the necessary quantity of water to restore the testing
pressure.
This quantity must not
exceed the water quantity, derived from the formula:
QH20 = 0, 125 x L / 1000 x P / 3 x
D / 25 x N
Where:
L =length in meters
P =testing pressure in bar
D =inside diameters in millimeters
N =number of hours
If the testing at
1 hour is positive, that of 12 hours will follow for
the same pressure value, with check carried out with
above calculation. |